JSW Energy Walk-In Drive| Thermal Power Projects Recruitment | Civil, Mechanical, Electrical, C&I, PMG Jobs

JSW Energy Limited, one of India’s leading private-sector power producers and a part of the US$23 Billion JSW Group, has announced a Walk-In Drive 2026 for experienced professionals in Thermal Power Projects. The recruitment is for the ongoing 1,800 MW (3 × 600 MW) JSW Mahanadi Power Company Limited (MPCL) project in Bilaspur, Chhattisgarh.

Candidates with 8–12 years of experience in the erection and construction of large thermal power plants are invited to attend the walk-in interview scheduled for the last week of August 2026.

JSW Energy Recruitment– Overview

Particular Details

Company Name

JSW Energy Limited

Job Type

Walk-In Interview

Industry

Thermal Power

Project

JSW Mahanadi Power Company Ltd. (MPCL)

Project Capacity

1,800 MW (3 × 600 MW)

Posting Location

Akaltara, Chhattisgarh

Walk-In Location

Raipur, Chhattisgarh

Interview Date

Last Week of August 2026

Qualification

B.E. / B.Tech or Equivalent

Experience

8–12 Years

About JSW Energy

JSW Energy Limited is one of India’s fastest-growing integrated power companies and a key part of the renowned JSW Group. The company develops, owns, and operates thermal, hydro, wind, and solar power projects across India while maintaining high standards of engineering, safety, and sustainability.

The current hiring is for the construction activities of the JSW MPCL 1,800 MW Thermal Power Project in Chhattisgarh.

Open Positions

JSW Energy is hiring experienced professionals for the following departments:

Civil (BTG & BOP)

Mechanical (Boiler & Aux, TG & Aux, BOP)

Electrical (TG, Power System, HT & LT)

Control & Instrumentation (BTG, BOP, DCS/PLC)

Engineering Coordination & Documentation

Project Management Group (PMG)

Educational Qualification

Candidates should possess:

B.E.

B.Tech

Equivalent Engineering Degree

Experience Required

Applicants must have:

8 to 12 years of relevant experience.

Hands-on experience in erection and construction of 600 MW or higher Thermal Power Plants.

Job Location

Selected candidates will be posted at:

JSW MPCL (6 × 600 MW) Akaltara, Chhattisgarh

Walk-In Interview Details

Interview Venue: Raipur, Chhattisgarh

Interview Schedule: Last Week of August 2026

Applicants should carry:

Updated Resume

Passport-size Photographs

Educational Certificates

Experience Certificates

Government ID Proof

Latest Salary Documents (if applicable)

Key Responsibilities

Depending on the department, candidates may be responsible for:

Thermal power plant construction and erection

Boiler, Turbine & Generator installation

Balance of Plant (BOP) execution

Electrical systems installation (HT/LT)

DCS & PLC commissioning

Engineering documentation

Project planning and coordination

Quality, safety, and compliance monitoring

Skills Required

Thermal Power Plant Construction

Project Execution

Engineering Documentation

Boiler & Turbine Installation

Electrical Systems

Instrumentation & Automation

DCS / PLC

Project Planning

Team Coordination

Safety Standards

Why Join JSW Energy?

Opportunity to work with a leading Indian power company.

Exposure to mega thermal power projects.

Excellent career growth opportunities.

Professional work environment.

Attractive compensation and benefits.

Learn advanced power plant construction technologies.

Selection Process

The recruitment process generally includes:

Walk-In Registration

Resume Screening

Technical Interview

HR Discussion

Document Verification

Final Selection

How to Apply?

Interested candidates can attend the walk-in interview during the last week of August 2026 at Raipur, Chhattisgarh. Candidates may also use the QR code provided in the official recruitment notification to submit their application.

Technical FAQs

1. What is BTG and BOP in thermal power plants?

Answer: BTG (Boiler, Turbine & Generator) forms the main power generation system, while BOP (Balance of Plant) includes auxiliary systems such as cooling water, ash handling, fuel handling, compressed air, and water treatment.

2. What is the role of DCS and PLC in a thermal power plant?

Answer: DCS (Distributed Control System) is used to monitor and control the complete plant operation, whereas PLC (Programmable Logic Controller) is mainly used for automation of specific equipment and processes.

3. Why are HT and LT electrical systems important?

Answer: HT (High Tension) systems are used for transmitting electrical power at high voltages, while LT (Low Tension) systems distribute electricity safely to plant equipment and auxiliary systems.

4. What responsibilities does a Mechanical Engineer have during thermal power plant construction?

Answer: Mechanical engineers supervise boiler erection, turbine installation, piping systems, rotating equipment alignment, commissioning activities, and ensure compliance with engineering specifications and safety standards.

5. What is the role of the Project Management Group (PMG)?

Answer: PMG is responsible for project scheduling, planning, resource allocation, progress monitoring, risk management, interdepartmental coordination, cost control, and ensuring timely project completion.

JSW Energy Walk-In Drive| Thermal Power Projects Recruitment | Civil, Mechanical, Electrical, C&I, PMG Jobs
JSW Energy Walk-In Drive| Thermal Power Projects Recruitment | Civil, Mechanical, Electrical, C&I, PMG Jobs

Leave a Comment

Your email address will not be published. Required fields are marked *