L&T Energy’s Offshore Wind Business is conducting a walk-in interview drive for experienced professionals in Supply Chain Management and Quality Assurance/Quality Control (QA/QC). The company is expanding its offshore wind energy operations and is looking for talented candidates with experience in Oil & Gas, EPC, Manufacturing, and Industrial Projects.
This recruitment drive offers an excellent opportunity to work on mega-scale offshore wind projects that support the global clean energy transition.
Company Details
Company Name: L&T Energy – Offshore Wind Business
Industry: Renewable Energy / Offshore Wind
Job Type: Permanent
Interview Mode: Walk-in Interview
Experience Required: 5–25 Years
Qualification: Full-Time Degree/Diploma with minimum 60% marks and consistent academic record
Open Positions
Supply Chain Management
- Buyer & Expeditor (Post Order)
- Structural
- Electrical
- Instrumentation & Telecom
- Mechanical
- Piping
- HVAC
- Architectural
- Modular Living Quarters (MLQ)
- HSE
- Specialty Transportation & Installation
- Buyer – Services
- Logistics Engineer / Coordinator
QA/QC Department
- Project Quality Manager
- Procurement Quality Assurance Manager / Engineer
- Structural
- Architecture
- EIT
- Mechanical
- Piping
- HVAC
- Quality Engineer – System Coordinator
Additional Advantage: Exposure to European client requirements and standards such as EN, ISO, and IEC.
Walk-in Interview Details
Interview Date: 4th October 2026 (Sunday)
Time: 9:00 AM to 5:00 PM
Venue:
A M Naik Tower,
2nd Floor, Breakout Area,
L&T Campus, Gate No. 3,
Jogeshwari-Vikhroli Link Road (JVLR),
Powai, Mumbai – 400072
Important Instructions
- Carry two copies of your updated CV.
- Mention the applied position at the top of your CV.
- Candidates unable to attend can email their resumes to: talent.Offshorewind@larsentoubro.com
- Career Portal: https://larsentoubrocareers.peoplestrong.com/home
Why Join L&T Offshore Wind?
- Work on large-scale renewable energy projects.
- Opportunity to contribute to global energy transition initiatives.
- Exposure to international standards and offshore technologies.
- Long-term career growth in a rapidly expanding industry.
- Collaborative and inclusive work environment.
Technical FAQs
1. What is an Offshore Wind Farm?
An offshore wind farm consists of multiple wind turbines installed in sea or ocean locations to generate electricity using stronger and more consistent wind resources compared to onshore locations.
2. What are EN, ISO, and IEC Standards?
- EN: European Standards used across Europe.
- ISO: International Organization for Standardization guidelines.
- IEC: International Electrotechnical Commission standards for electrical and electronic systems.
These standards ensure quality, safety, and reliability in engineering projects.
3. What is the role of a Procurement Quality Assurance Engineer?
A Procurement QA Engineer ensures that materials and equipment supplied by vendors meet project specifications, quality standards, inspection requirements, and client expectations before delivery.
4. What does a Logistics Engineer do in Offshore Projects?
A Logistics Engineer plans transportation, storage, and movement of heavy equipment, modules, and project materials while ensuring timely delivery and cost optimization.
5. Why is QA/QC critical in Offshore Wind Projects?
QA/QC ensures structural integrity, equipment reliability, regulatory compliance, and operational safety. Proper quality control minimizes project risks and reduces maintenance costs throughout the wind farm’s lifecycle.


Leave a Comment